GROVE GMK 5220 PDF

Crane Specification search result for manufacturer: Grove and model: GMK Grúa Todo Terreno Rapida • Gru Fuoristrada Veloci. GMK product guide. t. 68 m. 12 – 37 m. m. N GROVE (MULTI) 24/10/06 Introduced in , the Grove t (metric) GMK (GMK in the USA) has been in production since It has a 68 m 7-section main boom and a jib.

Author: Dukora Nakinos
Country: Greece
Language: English (Spanish)
Genre: Art
Published (Last): 1 October 2017
Pages: 283
PDF File Size: 19.54 Mb
ePub File Size: 14.82 Mb
ISBN: 721-3-59822-742-2
Downloads: 59833
Price: Free* [*Free Regsitration Required]
Uploader: Feran

The five-axle Grove GMK has a t maximum capacity and a 68 m main boom. On the day there were over 30 people from both Ravago and AsiaE working on the set up for the technical set of lifts. Subscribe to the latest Manitowoc news. AsiaE calculated that the installation of the new aircon system would require three lifts, each of 14 t, to install the chiller plus another lift to position the 3 t of additional accessories, all of which would be lifted to the top of the building.

Related Articles  CORDELUNA ELIA BARCELO PDF DOWNLOAD

Download Image Hi-res Low-res. However, the roads surrounding the building were so narrow that 52200 though the GMK was compact enough to access the lift site, in order to extend its outriggers AsiaE had to get special permission from the local council to dismantle some barriers.

AsiaE was the logistics and delivery contractor, while Ravago, which is a multi-discipline industrial company, supplied the crane from its large rental fleet — one of the biggest in The Philippines.

The contractors in questions were, Ravago Equipment Rentals Inc. Founded inThe Manitowoc Company, Inc. Ravago recommended the crane not only because it trove the strength, reach and maneuverability to make the lifts, but also because it was fast enough to complete the job inside a day.

Reach can be extended to up to m through the addition of jib attachments. The crane operator set the lifting parameters in accordance with the engineering plans and the three lifting points for the chiller and accessories were set. An on-site audience was also in attendance, as senior engineering students from the university were invited to watch the installation work.

Related Articles  GEMRCN PDF DOWNLOAD

Grove-GMKMobile-crane – BTS Crane

One by one, each lift was completed and all went exactly to plan, with no damage to any surrounding object despite the highly congested working area. The crane is also relatively narrow, with a 3 m width, and at the Far Eastern University site that was a plus. Manitowoc Direct Login Request Access. Andy Gagarin, project manager with Ohms-Psi Construction Trading, said the smoothness of the installation process prompted some gmkk on the project.

Although 7 hours were initially allocated for the work, in the end the whole project was wrapped up in just 5202 hours.